Navigation

MACE – Woolgate Exchange

Project Overview CA Drillers were appointed by Mace to deliver the Builder’s Work in Connection (BWIC) package at the Woolgate…

Ardmore Construction – 10 Trinity Square, London (£1.7m Project)

Project Overview The historic 10 Trinity Square building in London, formerly the headquarters of the Port of London Authority, has…

Reinforced Concrete Hydrotherapy Pool Removal in Active Hospital Environment

Project Overview Our team recently completed the highly controlled removal of a reinforced concrete hydrotherapy pool within a live hospital…

Precision Core Drilling for Plant Room Pipework Installation

Project Overview CA DRILLERS recently completed a challenging core drilling project, delivering precise and efficient results for pipework installation within…

Erith Contractors – 15 Bishopsgate, London

Project Value: £250,000 Client: Erith Contractors Location: Tower 42 Estate, London Project Overview Located within the prestigious Tower 42 Estate,…

Case Study: Overbury January Contractors Safety Award

Project Royal College of Art, Kensington Overview We are proud to have been awarded the Overbury January Contractors Safety Award…

Stitched Drilling services

  Application: Pipe Installation in Confined Space Project Overview This case study highlights a stitched drilling project completed to create a 1.4m circular…

Concrete Cutting & Diamond Drilling Central London

  Concrete Cutting & Diamond Drilling  Central London Location: Central London Service Provided: Diamond Drilling, Hand Saw Cutting & Track Sawing Project…

Ground Anchor Systems

  Ground Anchor Systems Practical Training Service: Ground Anchor Systems Training Application: Safe Anchor Installation & On-Site Best Practices Project…

Find Out How Our Expertise Can Help You By Calling

CA DRILLERS ON

08009750891
To maximise health and safety procedures we make sure cores are held in place or supported from below when necessary to prevent hazards to personnel or equipment.