The CA Team was recently involved in a community project to extend the playground area at a school in London. The area was unused and needed transforming ready for the first day back of term.
This was a collaboration between Erith, CA Drillers and CA Telecom UK.
Erith cleared away the shrubbery, which had built up over the years –
making the area unusable
CA had to excavate out the area to a depth that allowed us to install MOT TYPE 1 Stone in order to be able to lay the new surface of asphalt.
It was then ready for a brand-new tarmac area to be laid, providing a smooth, durable surface for school activities. This provides more usable space for the students to use during break time.
Thanks to the grab lorry, we’ve been able to efficiently remove waste and bring in fresh materials.