Navigation

News

RC Wall Removal Adjacent to a Live Carriageway

Removal of a reinforced concrete wall alongside a live carriageway using our Brokk 305 with demolition jaws.

Reducing Pre-Cut Steels to Concrete Level

Recent photos from the team showing pre-cut steels reduced down to concrete level, ready for the next stage of works.

Large Diameter Core Holes Through Block and Brickwork in a Plant Room

450mm, 400mm and 200mm diameter core holes drilled through double block and brickwork for pipework installation.

360mm Core Drilling into a Service Box by the Sea

Drilling 360mm into a service box right next to the sea, another precision job delivered in a challenging environment.

Drilling for New Steel Brackets on Site Extension Works

20mm holes drilled for new steel brackets as part of extension works to increase site capacity, completed safely at height.

Track Sawing Separation Cuts Through Reinforced Concrete

A site revisit to complete additional track sawing separation cuts to a depth of 450mm through reinforced concrete walls and…

CA Drillers Golf Day 2026

Our 5th Annual Charity Golf Day Raises Over £20,000 for Four Incredible Causes Our 5th Annual Charity Golf Day, held…

CA Team Takes Part in Walker Construction’s Annual Charity Football Match

This afternoon, the CA team travelled to Folkestone to take part in Walker Construction UK Ltd.’s Annual 5-a-Side Charity Football…

CA Charity Golf Day

It was a pleasure to donate the first cheque from the money raised at the CA Charity Golf Day. We…

CA Charity Golf Day 2025 – Our Biggest and Best Yet!

On Friday 4th July, we proudly hosted our 4th Annual CA Charity Golf Day at the stunning Cave Hotel &…

We have successfully passed our recent RISQS audit

This achievement is a testament to our ongoing commitment to safety, compliance, and excellence within the rail industry. It highlights…

CA Team Day Out – Go Karting at Buckmore Park

What a fantastic day we had on Saturday 5th April at Buckmore Park! It was brilliant to bring together team…
1 2 3 4

Find Out How Our Expertise Can Help You By Calling

CA DRILLERS ON

08009750891
To maximise health and safety procedures we make sure cores are held in place or supported from below when necessary to prevent hazards to personnel or equipment.