Concrete chasing for electrical conduits means cutting controlled channels into existing walls, floors or soffits so electrical containment can sit concealed instead of surface-fixed. It suits many commercial refurbishments, but only once the structure, existing services and fire strategy have been checked.
HSE reports that uncontrolled chasing can produce peak silica dust exposures of around 5 mg/m³, against a workplace exposure limit of 0.1 mg/m³ averaged over eight hours. That describes uncontrolled work rather than every cutting situation, but it is why dust controls are planned before the first cut.
Offices are re-let, retail units re-planned and plant rooms upgraded, and the original cable routes rarely suit the new layout. New lighting, power, data and controls all need somewhere to go.
A concealed route keeps finishes clean and cables protected, which matters in commercial electrical refurbishment where clients judge the result by eye. HSE also advises limiting the need for chasing at design stage, so each route deserves a second look before it is committed.
A blockwork partition and a reinforced concrete core wall are different jobs. Concrete wall chasing needs the wall’s structural role confirmed first, and a chase can reduce the thickness of a fire-resisting wall.
Vertical drops to sockets are usually simpler than long horizontal runs. Horizontal wall channels are often restricted more tightly, particularly in masonry.
Start by establishing whether you are cutting a screed or a structural slab. A screed chase is mostly about finished floor levels and underfloor heating, while a slab brings reinforcement, embedded services, post-tensioned tendons and limited thickness.
Floor channels also need planning around floor boxes. Where two conduit runs cross, the combined depth can exceed what either route needs alone.
Exposed concrete soffits often carry lighting routes, and the work is overhead. Dust falls on the operator, platforms limit movement, and ceiling channels sit close to ductwork, pipework and fire protection that may already be installed.
Reinforcement position should be confirmed, not assumed, before any cut.
There is no standard size. Conduit diameter, the number of conduits sharing a channel, bends, junction boxes, required cover and the substrate all play a part, along with whatever the structure will tolerate.
Bends and junctions need more room than straight runs, and that is often where channels end up deeper than designed. An oversized channel removes more concrete, risks crossing more reinforcement and leaves more making-good for the finishing trades.
We start with coordinated drawings and structural information, then compare them with what is on site. Scanning helps locate reinforcement and embedded services, but it does not guarantee a clear route, so we treat results as evidence rather than proof.
Reinforcement is not cut without authorisation from whoever is responsible for the structure. Post-tensioned slabs need particular caution because damaging a tendon can have serious consequences, so those routes need drawings and engineering confirmation first.
Access, permits and area handovers are settled at this stage too.
Once a route is agreed, it is set out on the surface and checked against the scan markings. Hand-held chasers with on-tool extraction suit shorter runs, while track-mounted or floor saws can suit longer straight lengths in slabs.
Controlled cutting of two parallel lines is followed by removing the central strip with a breaker, then clearing and inspecting the channel. Equipment choice depends on the material, route length, access and site conditions rather than any single tool.
Dust extraction through an M or H class extractor, as HSE specifies, reduces exposure but does not eliminate it. Respiratory protective equipment is still needed as a back-up, and tight-fitting masks require fit testing.
In occupied buildings we add tent enclosures, barriers, careful cleaning and agreed working hours. Noise and vibration also need planning with the building users, because breaking out a channel can be disruptive.
The sequence normally runs from route approval, investigation and setting-out to cutting, channel clearance and inspection. Conduit installation, electrical installation and making-good follow.
A clean channel at the right depth lets the electrician fix conduit without chipping out extra concrete, and gives the finishing trades a predictable surface. Clashes with mechanical, plumbing or fire protection services are where rework starts, so a service coordination meeting before cutting is time well spent.
Surface-mounted containment, suspended ceiling voids, raised access floors, new partitions or existing service voids can be less intrusive than cutting into structure. They avoid reinforcement and silica risk, although they change the finished appearance and headroom.
Chasing makes sense where concealed routes are needed and the structure allows them. If scanning shows dense reinforcement or post-tensioning in the way, a different route is often the better answer.
On the Old War Office restoration in Westminster, we chased electrical conduits across ceilings, walls and slabs for Ardmore Construction. That allowed modern electrical systems to be installed within a historic building.
Tent enclosures, Chapter 8 barriers and dust cube extraction kept the work areas controlled. A job like that is as much about protection and coordination as it is about cutting.
Cost and programme depend on dimensions, concrete type, access, cutting method, scanning, dust control, occupancy, working hours, route complexity, waste removal and handover requirements. None of that can be priced sensibly without seeing the drawings.
Send us your routes, drawings, access details and substrate information, and our team at CA Drillers will help you work out whether chasing or another method suits the job.
Often, yes, but reinforcement must not be cut without authorisation from the person responsible for the structure. The route is normally reviewed against structural drawings and scan results first.
There is no fixed depth. It is set by conduit size, the number of conduits, required cover and the substrate, within limits the structure can accept.
In many cases, yes, and a screed is usually more forgiving than a structural slab. Post-tensioned slabs need extra care and engineering confirmation before any cutting.
Through on-tool extraction with a suitable extractor, containment, regular cleaning and respiratory protective equipment. Extraction reduces exposure rather than removing it.
Neither is better in every case. Chasing suits projects needing concealed routes, while surface-mounted containment can suit areas where the structure restricts cutting.