Ardmore Construction – The Old War Office

CA Drillers team were involved in the esteemed restoration project at the historic Old War Office, an iconic site nestled in the heart of Westminster. As the project progressed, our team expanded, reaching a robust strength of 60 skilled operatives during its most demanding phase.

Our extensive scope of work showcased our versatility and expertise in a variety of challenging tasks. This included the diamond drilling of substantial sump pits in the basement areas, complemented by the advanced use of Brokk demolition robots for efficient break-out operations. In the swimming pool area, we undertook precise core drilling to accommodate lighting installations, blending functionality with aesthetic considerations.

Furthermore, our team formed builders’ work openings, employing both hand saws and track saws, coupled with stitch drilling techniques to avoid overcutting. Followed by the installation of lintels was carried out with across all levels, reinforcing the framework of the building. In adherence to stringent health and safety measures, we implemented control measures in our work areas which included full tent enclosures, chapter 8 barriers for demarcation, and dust cubes for effective extraction of any dust generated during our operations.

Our responsibilities also extended to complex tasks such as forming rainwater pipes, a challenging process that began at the roof and involved cutting and breaking through walls and slabs, down to the fourth basement level. Additionally, we were tasked with the intricate chasing of electrical conduits within the ceilings, slabs, and walls throughout the entire building.

A particularly challenging aspect of our work involved the wire saw removal of steel-plated, bomb-proof walls encircling the building. The scale and diversity of our work package not only demonstrated our technical prowess but also our dedication to preserving and enhancing a building that is a symbol of British heritage. CA Drillers takes immense pride in having played a pivotal role in the restoration of this venerable landmark, contributing to the conservation of its rich history and architectural grandeur.

Find Out How Our Expertise Can Help You By Calling

CA DRILLERS ON

08009750891
To maximise health and safety procedures we make sure cores are held in place or supported from below when necessary to prevent hazards to personnel or equipment.